Evaluate the customer drawing and procure the needed BOQ.
Make the costing from the price list.
Assess different suppliers to get best cost‑saving solutions.
Make Design and costing of Electrical Panel.
Build base Design, Facts Design Drawing Submittals, O&M Manuals for IEC range of LV equipment comprising LV Switchgear and control gear for AC and DC application, Distribution Board, panel board, Motor Control Center with starters like soft starter, direct online, star‑delta, Automatic Power Factor Correction, Generator Synchronization Panel, Package SS, Unit SS, Cable Ladder & Tray.
Compute the bus bar size needed for ETO LV equipment.
Respond to customer comments and review drawings submittal consequently.
Permit purchase request for materials.
Deliver accepted design and other related inputs to the Production File Management team members.