Position Overview
External Signage board required painting and lights Break Down Posted On: January 26, 2026 Closing On: January 31, 2026
JOB REFERENCE: JB
The External Signage board 2 Nos required painting and lights of the signage board BOH need to be fixed.
Scope of Work Supply and installation of front-light 3D aluminum letters, including rainproof transformer. LED usedul>
Wall preparation and painting work - Remove old paint
- Sanding and primer application
- New paint using Jotun primer
Supply and installation of stainless steel plates - Engraving and paint included
Supply and installation of digital UV printed stickers - Matt lamination
- Fixed on glass door
- As per discussion
Use UV protection paints Note: kindly do the site visit before submitting the quotation. we will not accept any variations after WO.