Position Overview
1x Gold card electrician required
Must have 2391 and tester
£300 for the shift
Tescos Bradford Road, Melksham, SN12 8LQ
Start: 4pm - finish once the woek is completed
Scope of Works
• Isolate the power to the SCO corals in scope
• Disconnect all Category 6 data network ports and 13A power sockets currently feeding the terminals
• Pull back the existing cabling and safely coil
• Remove all faceplates/sockets and backboxes and safely store them
• Wait whilst NCR engineers remove the legacy SCO terminals and re-install the new terminals in place
• Re-route the previously pulled back cabling into the new SCO terminals
• Reinstate the previously removed backboxes
• Re-terminate the previously removed Category 6 modules/faceplates and 13A sockets
• Reinstate power and test the re-terminated sockets