Position Overview
Proposal for Replacement of Chemical Dosing Pump - J and G Building
Break Down Posted On: February 24, 2026 Closing On: March 2, 2026
JOB REFERENCE:
JB
Proposal for Replacement of Chemical Dosing Pump:
- The chilled water chemical dosing pumps in all three buildings have been non-functional for an extended period. As a result, no routine chemical dosing has occurred, which has likely led to degraded water quality and an increased risk of corrosion and scaling within the chilled water system.
- Immediate replacement of the dosing pumps is essential. Regular chemical dosing must be restored to protect the chilled water system, maintain efficiency, and prevent long-term damage to equipment.
Terms & Condition
Dubai Trade License and Activity
NOTE TO VENDORS As per the rules, all vendors supplying services in the Emirate of Dubai must have trade license issued by relevant auth...