Position Overview
Basement 1 Storeroom Wooden Door Rectification Works - DIAMOND TOWER
Posted: June 11, 2026 | Closing: June 17, 2026
Job reference: JB
Scope of Work
- Inspect the existing wooden storeroom door at Basement 1.
- Remove the defective door and damaged hinges.
- Realign the door frame and door leaf to ensure proper alignment.
- Supply and install new hinges and all necessary fittings/accessories as required.
- Adjust and secure the door to ensure smooth opening and closing operation.
- Test the door functionality and carry out final adjustments.
- Complete all makingβgood works and remove debris from the work area.
Location: The Diamond Tower, Dubai Sports City, Dubai, United Arab Emirates
#J-18808-Ljbffr